2nd tech counselor visit

Jason came over for a visit today and reviewed my work on the aft fuse. We talked about some of the wiring runs and some of the more challenging rivets. His comment in the write up of “very high quality” was really encouraging. We also looked over the QB wings and fuse and he gave me some great advice while also pointing out some issues. There is a lack of deburring on the wing spar “waffles”, which I emailed Vans about. Also a couple of scratches and notches that I’ll need to debur.

Later in the day, I went to work riveting a few rivets that I had found to be difficult on the aft fuse, and had left until after I had talked to Jason. These rivets were instructed by the j-channel, and when I set them using the foot of my I long bar, the rivets had a tendency to cleave over. Jason offered a couple of simple suggestions, including taping my other bucking bar to increase mass and center the rivet along the center of mass. This worked great!

Taping two bars together helped put more mass inline with the rivet being bucked

Unfortunately I ended up cracking dimples on two rivets, when I stupidly set the rivet while it was not completely square with the holes. For some reason, a alignment issue caused the rivets to not sit squarely in the hole, and instead of investigating and perhaps reeming the hole, I set the rivet. This caused the rivet to transfer stress to the bulkhead flange and crack the edge of the dimple. Really stupidly, I did it twice, on different bulkheads. I didn’t detect the first one until after setting the second rivet. I emailed Vans asking for advice, and went to bed feeling frustrated.

One of the two cracked dimples. The other one is on the other side on a different bulkhead. I had left these rivets to the end because they are behind the j-channel, and setting them had Ben difficult

Drilled aft deck

There are a few holes on the aft deck components that need to be match drilled, as they are fabricated by the builder. Today I clecoed and clamped together these parts and drilled the 5 holes.

Aft deck parts clecoed in position. I used clamps to support these parts while drill the holes. Here you can see the cleco clamps on the aft brace where three holes are match drilled.

Primed aft deck parts

Aft deck and some top skin components cleaned, etched and ready to be primed

Today I primed the aft deck components and some of the top skin reinforcing parts. I used 50 grams of part A, and it was just enough to get a coating I was happy with.

Deburring aft deck parts

Tonight I spent an hour deburring some of the remaining parts for the aft fuselage. Not much to go now, just some aft deck components, and top skin parts with associated stiffeners.

Some of the remaining components for the aft fuselage after deburring

Angle stiffeners

Tonight I riveted on the two aft angle stiffeners, one on each side, below the inspection cover. This was easy, except for the bottom most rivet on each side. No matter what I tried, I struggled to get a bucking bar on the rivet. It worked out ok on one side, and was a mess on the other. Unfortunately, access to the bottom most rivet is almost impossible, so I have not attempted to replace it, for fear of making the situation worse. I’ll review it with my tech counselor when he comes (hopefully soon).

Outside view of stiffeners going from bottom left to top right. Smudges on the skin are due to rivet tape residue which I’ll wipe up soon

Inside view of right hand stiffener

Left hand side. Problematic rivet in red

Attached rudder stops and nut plates

Today I completed a couple of steps on the aft fuse by attaching the rudder stops and about 30 nut plates.

The rudder stops turned out to be easier than I thought. I was able to start by squeezing the aft two rivets easily, and then bucking the forward two without much trouble. I did the right aft side, then the left aft side, then right forward side, then left. Both came out fine.

Aft end showing 4 squeezed rivets holding the rudder stops on, with two holes to go on the forward ends
The vacant holes below will get rivets soon. The bottom one is the aft-most rivet that goes through the side skin, bottom skin, and bulkhead. The other empty hole is for the angle stiffeners which goes up and to the right on a 45 degree angle
Fairly easy to rivet, although clearances were very tight

Then I dimpled a set of nutplates and started riveting them on. I dimpled 4 nut plates that I shouldn’t have, as I found an error in the drawings. The diagram called out for 9 dimpled nutplates and 5 un-dimpled on each side. But it should have been 7 dimpled and 7 in-dimpled, as there are 7 that sit flush with the longerons. I have a ton of these things, so it didn’t matter at this stage.

I started with all the un-dimpled nutplates, which was quick and easy. Unfortunately I had to drill out a rivet when I inserted it without checking that it was passing through the nutplate. It wasn’t, so I drilled and redid that one.

When I moved onto the dimpled nutplates, I realized I hadn’t held the nutplates steady enough when dimpling. As a result, many of them were slightly bow shaped. This was problematic, as they wouldn’t sit flush against the holes, and had a tendency to break when the second rivet was set. It took me a few nutplates to realize what was going on, and then I drilled out several, dimpled new nutplates (this time holding them level when dimpling), and then re-riveted them on.

Dimpling a platenut

The end result was ok. Some of my rivets didn’t set as well as I wanted, but these are not structural, and plenty strong enough to support the screws they will be holding. my main concern was making sure they were straight, aligned with the hole, and not likely to snap off.

Looking left to right through the access panels. Here you can see the outside view of the left hand rivets holding the nutplates, and the inside view of the right hand side nutplates. These hold screw that secure the access panels here, under the horizontal stabilizer.

Finished inventory

Tonight I finished the inventory of parts for the wings and fuse, everything was there except a few minor pieces of hardware. I sent an email to Vans and detailed the few missing pieces.

I pulled the plans out of their envelopes and combined with those of the tail kit. Once I’m done with the aft fuse, I’ll be going over every step of the wings and fuse plans to make sure everything is completed as expected.

Quickbuild Wings and Fuse arrive

Today was a big day! My Quickbuild fuselage and wing kits arrived! I decided to use Stewart Trucking to have it delivered, rather than having it crates and shipped. I’m glad I did, as the whole process was easy and painless. Mike the driver was excellent to work with, and we had the wings and then fuselage down in no time.

Factory Five shipping truck

The most difficult part of unloading was getting the wings down onto the back of the truck. Mike has 6 pairs of wings, and 5 fuselages in the truck, and my wings were loaded on a rack near the top of the truck. It was slightly awkward getting the wings down, mostly due to the greasy film on the wing surfaces, which is applied to avoid any possible corruption while skipping. Holding a slippery wing over my head, and then trying to lower it down was a bit nerve-wracking, but not very hard. Then we carefully wheeled the cart into the garage.

Full load of airplanes! 6 pairs of wings and 5 fuselages

With the wings off, Mike used the crane to hoist the fuse up, lift it back and out of the truck. With my dolly parked behind the truck, he easily dropped it into position. Weighing in at 600 pounds, we were careful to put it in the middle, and where I wanted it. then it was up into the garage, no problem.

Crane lowering the fuse down onto the dolly. Mike was an expert
Fuse on the dolly
Safely inside the garage, tight, but everything fits with a little room to spare

I spent the evening unpacking the plane, and inspecting as best I could. I didn’t see any problems, but I will be doing a through inspection of every step to ensure there are no mistakes. For tonight I was happy to just get the fuse emptied of the various boxes and parts.

Starting the inventory step